Why Choose MET Build UK
Our in house design and production facilities guarantee your building will be produced to the highest standards in the quickest time possible.
Due to the high quality control procedures that we operate your Light Steel Frame System will be delivered with a blend of guaranteed performance, competitive pricing and customer service that is unrivalled
Due to the high quality control procedures that we operate your Light Steel Frame System will be delivered with a blend of guaranteed performance, competitive pricing and customer service that is unrivalled
Faster Installation
A faster build program will reduce overall onsite costs due to reduced project management, hiring scaffolding, plant, temporary accommodation, safety and security equipment, giving earlier cash recovery, improved cash flow and increased capacity.
Structural Stability & Reduced Load
There is no shrinkage, meaning no callbacks,
and the reduced weight of up to
60% saves on foundations.
One Supplier
Makes the build
less complicated, supported by a consultative approach, including design, precision engineering, offsite manufacture and onsite install and completion.
Lower Insurance
Light steel is non-combustible and the faster
installation can result in savings
of as much as 30% on:
Builders’ risk & construction
insurance
Ownership insurance costs
including general liability
Worker’s compensation
Commercial property insurance.
Increased Productivity
Follow-on
trades can work as the building is
assembled.
Repeat System
Reduces design and engineering costs,
and a repeated project can be on site
in under 15 days.