Why Choose MET Build UK

Our in house design and production facilities guarantee your building will be produced to the highest standards in the quickest time possible.
Due to the high quality control procedures that we operate your Light Steel Frame System will be delivered with a blend of guaranteed performance, competitive pricing and customer service that is unrivalled

Faster Installation

A faster build program will reduce overall onsite costs due to reduced project management, hiring scaffolding, plant, temporary accommodation, safety and security equipment, giving earlier cash recovery, improved cash flow and increased capacity.

Structural Stability & Reduced Load

There is no shrinkage, meaning no callbacks, and the reduced weight of up to 60% saves on foundations.

One Supplier

Makes the build less complicated, supported by a consultative approach, including design, precision engineering, offsite manufacture and onsite install and completion.

Lower Insurance

Light steel is non-combustible and the faster installation can result in savings of as much as 30% on:
  • Builders’ risk & construction insurance
  • Ownership insurance costs including general liability
  • Worker’s compensation
  • Commercial property insurance.
  • Increased Productivity

    Follow-on trades can work as the building is assembled.

    Repeat System

    Reduces design and engineering costs, and a repeated project can be on site in under 15 days.
    Met Build UK
    Privacy Overview

    This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.